Siemens
2017: | VZL1 – Inner liner assembly line Complete replacement of PLC program S7-400, ca 500 I/O and 25 drives End customer Continental, Púchov |
---|---|
2017: | WMS – Fuel injector production system Modification of PLC program (change in production process) S7-300, ca 300 I/O, 5 drives and a Kuka robot, TCP communication with MES End customer Continental, Trutnov |
2018: | MEFI – Gas meter assembly line Program that collects process and production data and provides them to MES (OEE) S7-300, ca 500 I/O End customer Elster – Honeywell, Stará Turá |
2018: | VL7 – Sidewall extrusion line Integration of program for communication/control of product marking device WinAC RTX, WinCC, TCP communication End customer Continental, Púchov |
2018: | Rubber profile take-off belts Program for a new single-purpose machine S7-1200, ca 30 I/O and 2 drives End customer Henniges CZ, Hranice |
2019: | Schuler press – Moulding press for car components Diagnosing and correction of PLC malfunction S7-400 End customer Porsche Werkzeugbau, Dubnica nad Váhom |
2019: | Sealant applicator (2D trajectory) Positioning control replacement and new program S7-1500T, ca 50 I/O and 2 drives End customer Elster – Honeywell, Stará Turá |
2019: | Rubber profile take-off belts Program for a new single-purpose machine S7-1500, ca 30 I/O and 3 drives End customer ELDISY, Serbia |
2019: | VL5 – Squeegee extrusion line Replacement of rubber cooling program S7-400, ca 500 I/O and 25 drives End customer Continental, Púchov |
2019: | Rubber profile bending machine Program for a new single-purpose machine S7-1200, ca 20 I/O and 1 drive End customer ELDISY, Serbia |
2019: | Training – TIA Portal 1500 Service Lecturer S7-1500, Comfort panel, G120 End customer NES Nová Dubnica, Nová Dubnica |
2019: | Training – Step7 300/400 Service Lecturer S7-300, Comfort panel, G120 End customer NES Nová Dubnica, Nová Dubnica |
2019: | COMERIO – Free cooling Additional programming of control for cooling with central chilled waterS7-400, ca 40 I/O, WinCC Pro End customer Continental, Púchov |
2019: | Single-purpose machine PP4 Service replacement of control on an existing sin gle-purpose machineS7-1200, ca 20 I/O, Comfort panel End customer AAF International, Trenčín |
2019: | Sealant applicator (3D trajectory) Positioning control replacement and new program S7-1500T, ca 50 I/O and 3 drives End customer Elster – Honeywell, Stará Turá |
2020: | Small Component Line – extrusion line Changing the program for: tracking, recipe change, cutting o ut the wasteS7-1500 ca 800 I/O, TIA WinCC Pro and 40 drives End customer Apollo, Hungary |
2020: | Single-purpose riveting machine Program for a new single-purpose machine S7-1500, ca 80 I/O, Comfort panel, Sick safety PLC End customer Velux, Partizánske |
2021: | Line 292B – assembly of gearboxes for cars Collaboration on commissioning and debugging ca 15-x S7-1500, ca 50 I/O, ca 15 robots KUKA End customer Magna, Kechnec |
2021: | Maruishi – Large format package machine Diagnostics and correction of incorrect package stopping S7-300 ca 500 I/O and 15 drives End customer Mondi SCP, Ružomberok |
2021: | Press Onapres 2 Diagnostics and modification of the pr ogram for stopping the press in the lower dead position in man. mode according to the set positionS7-300 ca 150 I/O End customer Porsche Werkzeugbau, Dubnica nad Váhom |
2021: | Welding machine Branson UZ Smart Service replacement of control on an existing single-pu rpose machineS7-1200, cc 30 I/O End customer Elster – Honeywell, Stará Turá |
2021: | Line Audi– Assembly of the cooling unit of the car Collaboration on commissioning and debugging ca 8-x S7-1500, ca 30-100 I/O, WinnCC Advance End customer Mahle, Skalica |
2021: | REA3 – Assembly of unit for controlling the position of the turbo blades Collaboration on commissioning and debugging S7-1500 ca 1500 I/O, ca 10 robots KUKA End customer Magnety Marelli, Kechnec |
2021: | SE120 - Monoextruder Program for a new single-purpose machine S7-1500 ca 100 I/O, and 5 drves End customer Foia, Trenčín |
2022: | Gas meters CDM Commissioning and debugging of the mo ved lineseveral S7-300 and S7-1500 End customer Elster – Honeywell, Stará Turá |
2022: | Small Component Line – extrusion line Program modifications S7-1500 ca 800 I/O, TIA WinCC Pro and 40 drives End customer Apollo, Hungary |
2022: | Production of battery modules Supervision during initial production 3x S7-1500 ca 80 I/O, 6 robots KUKA End customer Porsche Werkzeugbau, Horná Streda |
2022: | SLO12K - Steel cord cutting line Program for a new machine S7-1500 , cca 430 I/O and 21 drives End customer KamaTire, Kazakhstan |
2022: | SLO87N - Steel cord cutting line Program for a new machine S7-1500 , cca 715 I/O and 39 drives End customer KamaTire, Kazakhstan |
2022: | SLO88N - Steel cord cutting line Program for a new machine S7-1500 , cca 710 I/O and 39 drives End customer KamaTire, Kazakhstan |
2023: | Test device for measuring the torque loss of the bearing Program for a new single-purpose machine S7-1200 ca 30 I/O, 1 drive End customer KINEX BEARINGS, Bytča |
2023: | Grooving of SSR inserts Change of control, new program S7-1500 ca 40 I/O, Comfort panel End customer Continental, Púchov |
2023: | Roller Head Line – extrusion line Change in the program for replacing thickness measuring devices + Thickness regulationS7-1500 ca 800 I/O, TIA WinCC Pro and 40 drives End customer Apollo, Hungary |
2023: | CDM Gas meter leak test Complete replacement of the control (S7-300 fo r S7-1200) and electrical installationS7-1200 ca 30 I/O, HMI End customer Elster – Honeywell, Stará Turá |
2023: | Electric gearbox for Mercedes eATS 1.6 Cooperation on "offline" programming S7-1500 ca 100 I/O, HMI, robots KUKA End customer MAGNA Austria |
2023: | Cutting machine for a rubber profile P64 Program and wiring for a new single-purpose machine S7-1200 ca 30 I/O, HMI End customer SaarGummi, Dolné Vestenice |